KitLog pro

Powered By Kitlog Pro v2.0

My RV-8 build
' style=
Date:  6-11-2013
Number of Hours:  4.00
Manual Reference:  Page 8-38
Brief Description:  Fuselage assembly #15

I've been very tardy with my updates.

This session has been in a few stages. A few of my buddies I fly with came over to see the build and helped me flip the canoe over for riveting the bottom skins.

Mike and Jer, much thanks.

I actually got my wife to come out and do some bucking for me while I backriver the bulkheads to the bottom skin. Worked very well.

I then was able to talk my oldest daughter to come out and do some more riveting with me, since she did I great job on the wings. After a few whacks with the gun on the table, she was good to go.

We finished off most of the bottom rivets, and have to get about another 40 or so. She did a great job!
' style=

Fuse flipped

Fuse flipped

' style=

My handy dandy riveter!

My handy dandy riveter!

' style=

Great work she did!!

Great work she did!!

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.